Bridge over the Arges River

Romania, Pitești
2014-2016
Motorway Viaduct

120 m
Mixed structure
40 m
incremental assembly

Bridge in Romania: study of the method of assembly and supply of equipment

For this work SPIC developed the study of the assembly method and the design and supply of equipment for the incremental launching..

The small spaces and the specificity of the very light structures required a very advanced study of the method and equipment.

Complex or large works
That we optimize in terms of production and cost