Roccaprebalza viaduct – A15 Cisa motorway

A realization at a high altitude The viaduct, made of a mixed structure with lateral steel beams and upper and lower concrete slabs, has a maximum span between the piers of 125 m. The construction technique, which SPIC dominates perfectly, has allowed us to operate in a very inaccessible area and with piles up to … Continued

Viaduct over the Taro river – TiBre motorway (Tyrrhenian – Brenner)

Construction sites in parallel The work consists of two side-by-side viaducts, each approximately 2 km long, for a total of 39 spans with a maximum length of 100 m. The construction was carried out by operating in parallel on seven distinct positions, which made it possible to carry out the work in a very short … Continued