WHSD – Saint Petersburg Ring

An incremental launching of 168 m of free span The access of ships from the sea to the port required, before the construction of the viaduct, the interruption of the road system and the lifting of the movable bridges, an activity that was carried out at night. The connection between North and South, in the … Continued