Brescia Metrobus; section Prealpino S.Eufemia

A slender, high-performance deck This viaduct represents the last stretch to the south-east of the Brescia underground and is composed of 55 piers and 6 abutments with a maximum span of 30m. The static scheme that has been used is that of a double-span beam, wedged on the central pile and simply resting on the … Continued

Bridge over the Serchio; SS12; Lucca

Arch bridge in steel structure and reinforced concrete deck Construction works for the connection to the state road 12 through the adaptation of the provincial road 2 Ludovica for the connection of the state road 12 with Borgo Amozzano on the right bank of the Serchio. The deck is structurally composed of a continuous beam … Continued

Ponte Savena; Milan-Naples HS line Treats Bologna Florence

Reinforced concrete arch bridge The work consists of a concrete deck, built on site, supported by metal hangers attached to a reinforced concrete arch. The deck, which structurally is a continuous beam, was realised in an area next to the erection site, in three parts of about 20 m each and launched by pushing with … Continued

Deck slabs viaducts; High-speed line Milan – Venice. Section Pozzuolo M. – Treviglio

High Speed ​​Milan – Venice Line. Treviglio Brescia section. Execution of the structural concrete slab and of the transoms for the railway viaducts of the project. In these works, the casting of the slab was made with the use of a formwork mounted on the edge beams by means of metal shelves. This solution avoids … Continued